Opera House


Home

Project goals

Project partners

Royal Playhouse

Opera House
   Ventilation
   Control strategies
   Photovoltaic fa?ade
   Energy objectives
   Results

Library

Dissemination

Results

Prices won







Privacy, Disclamer and rights
 

Demand controlled and energy efficient distribution of ventilation, including humidity control

The Opera House has a high maximum ventilation rate and a long running time for the plants. The users are highly sensitive to poor indoor climate and require humidity control of the air.

The Opera project will provide solutions to control the ventilation and humidity with re-spect to indoor air quality, temperature and humidity when the users are in the building.

Energy efficient in-house energy distribution systems

For the Opera House, the energy for the distribution of ventilation air is most critical. The first step to reduce this is the demand controlled ventilation. The next step is design of a ventilation system with a low SFP (Specific Fan Power).

Humidity control through active use of building material and technical systems

A control strategy to reduce the risk of condensation and fungi will be developed. Condensation risk detection systems will also be used.

  WANT TO KNOW MORE?

If you have any questions about our project, please contact:

Peter Weitzmann
Project Manager
Energy Department
Phone: +45 4597 2397
E-mail: Peter Weitzmann

  WEB-CAM LINKS

Opera House
Library

 

  PROJECT PARTNERS

COWI A/S
The Royal Danish Theatre
Ontwikkelingsbedrijf
   Gemeente Amsterdam

Ecofys bv
Statsbygg
Erichsen & Horgen AS