Library


Home

Project goals

Project partners

Royal Playhouse

Opera House

Library
   Energy Storage
   Ventilation
   Photovoltaic
   Building Management System
   Energy Objectives
   Results

Dissemination

Results

Prices won







Privacy, Disclamer and rights
 

Controlled ventilation

Ventilation system

The pre-design of the building is calculating with a high temperature air inlet into the building with a temperature of 18 to 21?C. This means that a long period over the year outside air can be used without heating.

The ventilation system will be controlled by minimum CO2 levels. The CO2 levels of the exhaust air are measured. In this way an efficient use of energy for ventilation will be achieved. Between incoming and outlet air a heat recovery system is placed.

  WANT TO KNOW MORE?

If you have any questions about our project, please contact:

Peter Weitzmann
Project Manager
Energy Department
Phone: +45 4597 2397
E-mail: Peter Weitzmann

  WEB-CAM LINKS

Opera House
Library

 

  PROJECT PARTNERS

COWI A/S
The Royal Danish Theatre
Ontwikkelingsbedrijf
   Gemeente Amsterdam

Ecofys bv
Statsbygg
Erichsen & Horgen AS